The personnel platform must not be loaded in excess of its rated capacity. %PDF-1.5
(. The trial lift must be performed immediately prior to each shift in which personnel will be hoisted. <>
[75 FR 48159, August 9, 2010; 85 FR 8746, Feb 18, 2020], Occupational Safety & Health Administration. There are high demands on lowering and lifting people and special people winches or man riding winches (MRW) are applied. <>
The employee must be in either a personnel platform or on a boatswain's chair. /Filter /LZWDecode
Where there is more than one location to be reached from a single set-up position, either individual trial lifts for each location, or a single trial lift, in which the platform is moved sequentially to each location, must be performed; the method selected must be the same as the method that will be used to hoist the personnel. We understand that there are many factors that go into choosing the correct offshore rental equipment for a job! Each rental man-riding winch is transported on an engineered and certified skid package with certified lifting slings. xWmo0)_*R)-JU?d4eHt4sh ss;t~^c4]h-~>#PI+1g-C4ePFTWhhfRFtu.V%E'3z&S4FwlLy~}Oi*Mp)*4yRVc"d6:JhaC'4W}-Nm |fy-n_gY:k1)}X >>
Check out our new interactive catalog.

These rugged, oilfield tough winches have Type Approval or Independent Review certificates issued by the classification societies of ABS, DNV or LRS. Any condition found during the trial lift and subsequent inspection(s) that fails to meet a requirement of this standard or otherwise creates a safety hazard must be corrected before hoisting personnel. stream
In addition to the use of hard hats, employees must be protected by overhead protection on the personnel platform when employees are exposed to falling objects. Where the employer demonstrates that there is no less hazardous way to perform the work. The occupant using the controls in the platform must be a qualified person with respect to their use, including the safe limitations of the equipment and hazards associated with its operation.

This exception does not apply to rubber-tired equipment. /Length 11 0 R
Our STAR-series man riding winches (MRW) have been specially developed to allow people to descend and lift people safely from height, depth and confined spaces.
Bridles and associated rigging for suspending the personnel platform must be used only for the platform and the necessary employees, their tools and materials necessary to do their work. c3a
pa:T;`!l\0*8(@B7d7"& "VWWX:D When using equipment to hoist employees, the employees must be in a personnel platform that meets the requirements of paragraph (e) of this section. Personnel hoisting must not be conducted until the competent person determines that the platform and rigging have successfully passed the proof test. JFIF x x C Articulating cranes must be equipped with a properly functioning automatic overload protection device. Essential for temporary work at heights up to 33 meters (108 ft). At each jobsite, prior to hoisting employees on the personnel platform, and after any repair or modification, the platform and rigging must be proof tested to 125 percent of the platform's rated capacity. Adobe d C
The fall arrest system, including the attachment point (anchorage) used to comply with paragraph (i) of this section, must meet the requirements in 1926.502. ", The following paragraphs of this section apply: (a), (c), (d)(1), (d)(3), (d)(4), (e)(1), (e)(2), (e)(3), (f)(1), (f)(2)(i), (f)(3)(i), (g), (h), (k)(1), (k)(6), (k)(8), (k)(9), (k)(11)(i), (m), (n). 11 0 obj
All non-essential travel is postponed until further notice.

When the occupied personnel platform is in a stationary working position, the load and boom hoist brakes, swing brakes, and operator actuated secondary braking and locking features (such as pawls or dogs) or automatic secondary brakes must be engaged. In the event of a calamity, a victim can be rescued immediately in a controlled manner without the need for a manhole guard or rescuer to enter the risk area. This happens in particular in confined spaces such as tanks, ships holds, reactors, pits and from quay edges, platforms and so on. Equipment (except for derricks and articulating cranes) with a variable angle boom must be equipped with all of the following: A boom angle indicator, readily visible to the operator, and. The HONOR MRW33 man riding winch allows users to descend or hoist in a controlled manner.

The system must be attached to a structural member within the personnel platform. The personnel platform must be equipped with a guardrail system which meets the requirements of subpart M of this part, and must be enclosed at least from the toeboard to mid-rail with either solid construction material or expanded metal having openings no greater than inch (1.27 cm). endobj
HONOR Safety & Consultancy offers various solutions during temporary work at height and depth, when descending and lifting people. Keep all parts of the body inside the platform during raising, lowering, and horizontal movement. 1 0 obj

e 2MiZ /]HL

~8X8_$8)3?z
2AdJ7Cc
x+p;Hk$#y] 9,{"H"l@QT`@$ After proof testing, a competent person must inspect the platform and rigging to determine if the test has been passed. Our Effort Continues to Make a Difference! Man riding winches should be only operated by trained personnel.

This paragraph does not apply to work covered by subpart R (Steel Erection) of this part and also does not apply to routine personnel access to an underground worksite via shaft as covered by 1926.800 (Underground Construction) of this part. %PDF-1.3
%
Morgan City Rentals offers a line of man-riding winches which are designed and manufactured to standards and specifications established by offshore regulatory bodies for the purpose of lifting people. Tag lines must be used when necessary to control the platform. +RI$IBsUl{
h'mmU9 5w$>o!5m-?#t[?~olH{Mn7A}nKO\c m NexX0fZ@;0 @:wRl@hsD]!qt~:UbWmh
|H /45l{+3>}fq9}[7 JLY\N_V?RF\?PHOhltuW07}`R''3339f}o
X?mLgYj,?_YH8_7.WajA w~BW|'W K}| UY+'Fwnpk!2 oWXg^{ml
$^G_`u2tmy
v
6"vTNc6 NXO_Z{1OFt nv\? ]/S=Md: 7;u.? yKV52=^][lxkd{.+[4 +RI$I$_+W=C>l.(=K`;\OwL_Q.pNs]>t?3}F"zv: X et~c3JCDtv$ X et~c3JCDtv$ X et~c3JCDtv$c7\^a[\ :NoMXgQ80Nur{r=empp0`8/zIoBYW-pWG4zIoBYW-pWG4zIoBYW-pWG4=/./k (Y
'V=/./k R6b. *:JZjz ? endobj

The HONOR MRW15 man riding winch allows users to descend or hoist in a controlled manner. A Good Industrial Design recognition is not a prize but a quality mark as recognition for good craftsmanship. The lift will not exceed 50 percent of the equipment's rated capacity at any time during the lift. The employee must be in either a personnel platform or a marine-hoisted personnel transfer device. Eyes in wire rope slings must be fabricated with thimbles.

The platform must be lowered by controlled load lowering, braked, and held in a suspended position for a minimum of five minutes with the test load evenly distributed on the platform. d9Ct9]QJms 6J\a.Q(DwuZs%m^2Es6h:,q8P(P5QjR!)lA8svJu?$ j ]kcm<0nV2/eKJ\Vn]*jVz+>YCw#8D{\GF=4vv5~{DQ& ALQR\t7{Q-/@[)4U,Q8IL1BgsPwiI'-a8z@@0a0xo$Fcr8dJB#3;]T}]Z#loD4(V[U-5>uodu BnLt'

Morgan City Rentals/ Delta Rigging & Tools/ Bishop Lifting, the South Louisiana region locations top priority is to focus on the safety and well-being of our employees and their families. When working over or near water, the requirements of 1926.106 apply. NOTE: Morgan City Rentals can supply and install new domestic or imported wire rope and any specialized fabricated sling upon request. Employees being hoisted must remain in direct communication with the signal person (where used), or the operator. Equipment travel must be limited to boom length. CN
_Gn)[.)U+)b8,rFRhAg`Q&wU)nMhz2#w~.'. This trial run can be performed at the same time as the trial lift required by paragraph (h) of this section which tests the lift route. Let our sales team help! (. The fall protection equipment must meet the applicable requirements in 1926.502. Spooling/un-spooling of a customer owned wire rope will result in a nominal charge. endobj
The competent person must determine that: Safety devices and operational aids required by this section are activated and functioning properly. ", The following paragraphs of this section apply: (a), (c), (d)(1), (d)(3), (d)(4), (e)(1), (e)(2), (e)(3), (f)(1), (f)(2)(i), (f)(3)(i), (g), (h), (j), (k)(1), (k)(6), (k)(8), (k)(9), (k)(11)(i), (m), and (n). Hb```f``Q``e`[ @164f}_k|a]C9@\5hUL0WWM]p)-[8ZVsR%!]nfJ-{`e~)=~ys73o^KKLcie^-xl'oN6Pi 6{OA)@5 a# $) CdCk@A @!O51CWA$MAA?XDN03H*0k0D3p`l`? b42b;4#way*c` F
endstream
endobj
132 0 obj
401
endobj
107 0 obj
<<
/Type /Page
/Thumb 85 0 R
/Resources 108 0 R
/Contents [ 111 0 R 113 0 R 115 0 R 117 0 R 120 0 R 122 0 R 124 0 R 126 0 R ]
/MediaBox [ 0 0 595 841 ]
/CropBox [ 0 0 595 841 ]
/Rotate 0
/Parent 103 0 R
>>
endobj
108 0 obj
<<
/ProcSet [ /PDF /Text /ImageC ]
/Font << /F5 118 0 R >>
/XObject << /Im10 129 0 R /Im11 130 0 R >>
/ExtGState << /GS1 128 0 R /GS2 127 0 R >>
/ColorSpace << /Cs5 109 0 R >>
>>
endobj
109 0 obj
[
/CalRGB << /WhitePoint [ 0.9505 1 1.089 ] /Gamma [ 2.22221 2.22221 2.22221 ]
/Matrix [ 0.4124 0.2126 0.0193 0.3576 0.71519 0.1192 0.1805 0.0722 0.9505 ] >>
]
endobj
110 0 obj
1842
endobj
111 0 obj
<< /Filter /FlateDecode /Length 110 0 R >>
stream

Direct attachment of a personnel platform to a luffing jib is prohibited. Not stand, sit on, or work from the top or intermediate rail or toeboard, or use any other means/device to raise their working height. >>
The bridles and associated rigging must not have been used for any purpose other than hoisting personnel. Lifting personnel with these winches is strictly limited to offshore marine applications. The platform overhead protection must not obscure the view of the operator or platform occupants (such as wire mesh that has up to inch openings), unless full protection is necessary. Of the screw type, with the screw pin secured from accidental removal. Not swing outward.

The platform must be hoisted a few inches with the personnel and materials/tools on board and inspected by a competent person to ensure that it is secure and properly balanced. 5 0 obj
%
An existing surface may be used as long as it meets these criteria. The lift route is changed, unless the competent person determines that the new route presents no new factors affecting safety. The load radius to be used during the lift has been accurately determined. Being a 24-hour rental equipment/service/ wire rope & rigging hardware supplier, non-operational personnel are asked to work remotely from home and will remain available via phone and email. In addition, the trial lift must be repeated prior to hoisting employees in each of the following circumstances: The equipment is moved and set up in a new location or returned to a previously used location. HW^5}YWjH$U] V2=?bH]:cJ[

Copyright 2020, Morgan City Rentals. The platform operating manual must be in the platform or on the equipment. Where rotation resistant rope is used, the slings must be capable of supporting without failure at least ten times the maximum intended load. The employee must use personal fall protection equipment, including a full body harness, independently attached to the lower load block or overhaul ball. All internal meetings will be held via phone or video conferencing.

Lack of CFM/PSI will cause brakes to not release causing failure! /Height 120
The boom must be parallel to the direction of travel, except where it is safer to do otherwise. /Subtype /Image
"YF A grab rail must be installed inside the entire perimeter of the personnel platform except for access gates/doors. Equipment with outriggers or stabilizers must have them all extended and locked. The personnel platform itself (excluding the guardrail system and personal fall arrest system anchorages), must be capable of supporting, without failure, its own weight and at least five times the maximum intended load.

Meet NPD, NMD and UK HSE regulations for personnel lifting operations, 25 Loyang Crescent, Block 103 Tops Ave, Luoyang Offshore Supply Base, 1 #04-05, 508988, DYNALINE LOAD MONITORS (LINE TENSION METERS). Multiple part lines must not be twisted around each other. Other safety devices and operational aids must meet the requirements of 1926.1415 and 1926.1416. Occupational Safety and Health Administration, Severe Storm and Flood Recovery Assistance. Essential for temporary work at heights up to 15 meters (49 ft). The requirements of this section are supplemental to the other requirements in this subpart and apply when one or more employees are hoisted. Where the terms "personnel platform" or "platform" are used in these paragraphs, substitute them with "boatswain's chair. The primary attachment must be centered over the platform. The number of workers occupying the transfer device must not exceed the maximum number it was designed to hold. 105 0 obj
<<
/Linearized 1
/O 107
/H [ 1056 524 ]
/L 1493734
/E 336088
/N 8
/T 1491515
>>
endobj
xref
105 28
0000000016 00000 n
0000000911 00000 n
0000001580 00000 n
0000001813 00000 n
0000002016 00000 n
0000002197 00000 n
0000002220 00000 n
0000004142 00000 n
0000004165 00000 n
0000006110 00000 n
0000006133 00000 n
0000008061 00000 n
0000008084 00000 n
0000009996 00000 n
0000010107 00000 n
0000010130 00000 n
0000011988 00000 n
0000012011 00000 n
0000013879 00000 n
0000013902 00000 n
0000015945 00000 n
0000015968 00000 n
0000017934 00000 n
0000018012 00000 n
0000018091 00000 n
0000324335 00000 n
0000001056 00000 n
0000001558 00000 n
trailer
<<
/Size 133
/Info 102 0 R
/Root 106 0 R
/Prev 1491504
/ID[<158372d10b9c6009f1061df0ded59068><4e869dfe58f9c4223144cb8f9c085df9>]
>>
startxref
0
%%EOF
106 0 obj
<<
/Type /Catalog
/Pages 103 0 R
/Outlines 84 0 R
/PageMode /UseThumbs
/PageLayout /TwoColumnRight
/Metadata 104 0 R
>>
endobj
131 0 obj
<< /S 229 /T 377 /O 429 /Filter /FlateDecode /Length 132 0 R >>
stream
4 0 obj
For lattice boom cranes: Clearly mark the cable (so that it can easily be seen by the operator) at a point that will give the operator sufficient time to stop the hoist to prevent two-blocking, or use a spotter who is in direct communication with the operator to inform the operator when this point is reached. * Warning: 120 MAX air pressure on all air hoists. Immediately after the trial lift, the competent person must: Conduct a visual inspection of the equipment, base support or ground, and personnel platform, to determine whether the trial lift has exposed any defect or problem or produced any adverse effect. Attended by the equipment operator, signal person (if used for the lift), employees to be hoisted, and the person responsible for the task to be performed. /Width 120
<>
Headroom must be sufficient to allow employees to stand upright in the platform. Its never been easier to get a fast quote on rental equipment! /Length 13 0 R
Points to which personal fall arrest systems are attached must meet the anchorage requirements in subpart M of this part. Where the terms "personnel platform" or "platform" are used in these paragraphs, substitute them with "boatswains chair. Nothing interferes with the equipment or the personnel platform in the course of the trial lift. The weight of the platform and its rated capacity must be conspicuously posted on the platform with a plate or other permanent marking. No charge for spooling/un-spooling of cable purchased from Morgan City Rentals. endobj
The Netherlands. Please do not hesitate to reach out to one of our rental/ rigging facilities. The system used to connect the personnel platform to the equipment must allow the platform to remain within 10 degrees of level, regardless of boom angle.

%
The employee must use personal fall protection equipment, including a full body harness, attached independent of the crane/derrick. 2 0 obj

Where the terms "personnel platform" or "platform" are used in these paragraphs, substitute them with "marine-hoisted personnel transfer device.

When there is no adequate structure for attachment of personal fall arrest equipment as required in 1926.502(d)(15), the attachment must be to the lower load block or overhaul ball. If using a personnel platform, paragraphs (a) through (n) of this section apply. The employee must be in a personnel platform or boatswain's chair. 12 0 obj
! endobj
endstream
20 meter (65.6 ft). stream
J~Moa)l%0}2j60W[=GWY%j,>]xJ,S]r%v.#n9Yo8D{. Hoisting of the personnel platform must be performed in a slow, controlled, cautious manner, with no sudden movements of the equipment or the platform. Except over water, employees occupying the personnel platform must be provided and use a personal fall arrest system. 1022
/Type /XObject
These man riding winches are always used in combination with fall arrest blocks (devices), often with integrated rescue winches (Recovery Blocks). If due to the size of the personnel platform, such as a 1-person platform, it is infeasible for the door to swing inward and allow safe entry for the platform occupant, then the access gate/door may swing outward. Be equipped with a device that prevents accidental opening. <<
endobj
All welding of the personnel platform and its components must be performed by a certified welder familiar with the weld grades, types and material specified in the platform design. Jacks Winches carry a range of Ingersoll Rand Man-Rider winches. The amount of extension must be the same for all outriggers and stabilizers and in accordance with manufacturer procedures and load charts. No more than one person must be hoisted at a time. The equipment must be uniformly level, within one percent of level grade, and located on footing that a qualified person has determined to be sufficiently firm and stable. The equipment operator must be at a set of equipment controls that include boom and swing functions of the equipment, and must be on site and in view of the equipment. /BitsPerComponent 8
If using a marine-hoisted personnel transfer device: The transfer device must be used only for transferring workers.
$.' A qualified person familiar with structural design must design the personnel platform and attachment/suspension system used for hoisting personnel. A product that meets these requirements is eligible for recognition. stream
All rights reserved.

endstream
A complete trial run must be performed to test the route of travel before employees are allowed to occupy the platform.

With the outbreak of COVID-19 (Coronavirus) and the current situation in the State of Louisiana, we are informing our clients, suppliers, and industry partners of the following: Morgan City Rentals is committed to our clients and their rental equipment rental needs.

<>/ExtGState<>/Font<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.32 841.92] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
Each employee must wear a U.S. Coast Guard personal flotation device approved for industrial use. 9 meter (29.5 ft), CWD16 Auto Belay Device, max. Rigging hardware (including wire rope, shackles, rings, master links, and other rigging hardware) and hooks must be capable of supporting, without failure, at least five times the maximum intended load applied or transmitted to that component. /ColorSpace /DeviceRGB
The following conditions must be determined by a competent person to exist before the lift of personnel proceeds: Hoist ropes must be free of deficiencies in accordance with 1926.1413(a).

10 0 obj
Palmpolstraat 88
Hooks used in the connection between the hoist line and the personnel platform (including hooks on overhaul ball assemblies, lower load blocks, bridle legs, or other attachment assemblies or components) must be: Of a type that can be closed and locked, eliminating the throat opening.

Evenly distributed within the confines of the platform while it is suspended.

home > Fall protection > Man riding winches (MRW). <<
The employee must use personal fall protection equipment, including a full body harness, attached independent of the crane/derrick.